History

THE HISTORY OF THE CAMPSITE

From a fish farm of Fritz Glass in 1931 originated from 1949 to 1950, the first swimming pool in Illertissen, with a size of 50m length and 18,5m in width.


Opening of the swimming pool in 1950

Schwimmbad früher
1954

Old fishermen's farm

Since that time there were no lakes, the crowd was very high. Even the lifeguard took advantage of the outdoor pool for their exercise, as it had 6m at the lowest point.

Schwimmbad früher
Bach mit Wasser
Forellenbächlein
Abbruch Nebengebäude 1998

In 1998 we have the old cabins, outbuildings and reception demolished to make room for new...

Anschliessend Neubau der Rezeption mit Lager, Büro und den eigenen Wohnräumen das 1999 fertig gestellt wurde

Neubau 98-3_1_0
Neubau 98-4_0
Neubau 98-5_0_0

And so the reception looks today. The access road was widened and shifted the barrier.

Rezeption und Zufahrt

On 01/09/2007 the demolition of the oldest wash house began in 1964.

Altes Waschhaus
Abbruch altes Waschhaus
Abbruch Dreikammergrube

Then the new.

Neubau Waschhaus
Rohbau Waschhaus
Fertigstellung Waschhaus

During the construction of the latest state of the art, the site of the Abwassernetzt the town of Illertissen was connected via a newly laid pressure sewer and pump shafts. Gas pipelines have been laid, so as to bring environmentally friendly water and heating to temperature.

Pumpschacht
Abbruch Dreikammergrube
Anschluss Abwasserhochdruck

Thus, the wash-house newly built looks from June 2009.

Waschhaus 2009

First part of rehabilitation sanitary building - roof and facade 2017

Sanierung Dach Waschhaus
Neues Dach Waschhaus

Automation also with us: barrier before - after 2017

Schranke neu
Zufahrt
Fest Wolpi (28)

Oktoberfest for our campers 2018 

Fest Wolpi (14)
Fest Wolpi (2)
Fest Wolpi (67)
Fest Wolpi (102)
Fest Wolpi (112)
Asphaltieren der Wege
Asphaltieren der Wege

The paths were re-asphalted 2019

before

Eigene Stromkästen
Beleuchtung

Electrical boxes with lighting - house development

A major effort was the renovation of our large wash house over the winter months of 2020/2021. Gutted down to the walls and then rebuilt with the most modern and hygienic technology. We are of the opinion that a sanitary building should / can also be an oasis of well-being. Make your own picture of it.

Nacher
Vorher
1954
1954

By chance came 1952, the first tent sites. The campsite was born.

1962_04
1964_03
Luftbild 1954
1964_06
1962_05

first brochure 1954

In 1955 the accession to the DCC (German Camping Club).

1962_02

first brochure 1958

1962_01

first brochure 1962

In 1964 the first sanitary facilities for camping and bathers.

1964_01

Shortly thereafter, changing rooms and a restaurant were built.

Luftbild 1966

1966, the campsite was enlarged to the south. The first caravans came.

1962_06
1964_02

In 1972, the remaining extension to the still existing size of 3.5 acres. Paths created, electricity, water, sewage and lighting was laid.
Places divided, and already settled the first time campers.

1964

1975 had to be reduced to the length of 18 meters swimming pool. Since then, the bathroom is only the campers and Dauercampern available.

Verkleinerung Schwimmbad
Homepage
Sanitär gross 1
Sanitär gross 2

Then in 1977 came the second major sanitary facilities.

1981 was the last year in which the stream ran through the campground or water from the source.
Three years was then artificially water filled before also has run out.

Sanierung Schwimmbad
Sanierung Schwimmbad

Renovation of the swimming pool 2016:

Sanierung Schwimmbad
Sanierung Schwimmbad
Neue Farbe Rezeption
Neue Farbe Rezeption

Redesigned reception 2016/2017:

Neue Farbe Rezeption
Neue Farbe Rezeption
Entkernen
Vorher
Entkernt
Leer

meanwhile

Stellplätze
Umbau
Rohbau
Verputzen
Estrich mit Gefälle
Fertig

after - well done

Fertig
Waschmaschinen
Fertig
Trennwände
Duschen
Aussen

And we are far from finished, just come to us ...